GT Power Parallel Connection Cable

SKU: 16757
In stock
1. Start both units and run until the engine speed settles.
2. Make sure the smart throttle function is turned off on both units for parallel operation.
3. Connect the parallel ports from each unit together taking note of the correct colours and the earthing connection.
4 Connect the load to any of the power outlet sockets on either generator, ensuring that the load does not exceed the maximum rated output for parallel operation. Maximum output as marked on lead.

Machines need to be of the same Brand and Power output – ie 2 x GT2005i. NOT 1 GT2005i & 1 GT3500i.

$69.00

Add to Wishlist
Add to Wishlist

Description

GT Power Parallel Connection Cable Synchronise two units for increased power demands